Projects and planning

Will my grass get damaged during the job?

The short answer

Some of it, in places you can predict. A loaded ready-mix truck is heavy enough to rut soft ground, so the route it takes marks up worst. Add a working strip around the forms and, on a pumped pour, the line the hose gets dragged along. The rest of the yard usually comes through fine. Wet ground damages far worse than dry ground, which is one more reason pours get scheduled around the forecast.

Weight is what hurts a lawn, not concrete

People picture splashes and washout. Those are the small part. What actually marks a yard is a loaded ready-mix truck crossing turf, because the tires tear the sod and, worse, the ground underneath takes the compaction. Torn sod grows back. Compacted ground stays compacted, which is why a rut can still be a visible low line the following spring even after the grass fills in over it.

Everything else is minor by comparison. Foot traffic scuffs. A little concrete splash off a chute or a hose end washes or lifts off. A pump and trailer parked in one place flattens grass rather than destroying it, as long as the ground is firm when it sets up.

The truck can come to the forms, or the concrete can

This is the fork that decides where the damage lands. If a ready-mix truck can back to the forms, the concrete goes straight down the chute. It is the simplest way to place a pour, and the price of that simplicity is that a very heavy truck goes wherever the forms are.

If it cannot get there, or if the ground between the pavement and the forms will not carry it, the concrete travels instead. Our trailer line pump sets up on the ground and pushes concrete through 2.5 inch or 3 inch hose while the loaded truck stays on the drive. What crosses your grass then is hose, and hose leaves a flattened, scuffed line instead of a rut you regrade.

That decision is really about access, yardage and where the pour has to land rather than about your lawn, and the pumping side of the site works it through properly. Just know that the answer has a yard consequence and that it is a fair thing to raise while somebody is standing there with a tape.

The places that will show, so you can plan around them

None of this is random. There are about five places that take the wear, and they are all known before the day.

  • The route the loaded truck takes in, and the spot it turns around
  • A working strip along the outside of the forms, where the crew has to stand
  • The hose path on a pumped pour, plus the ground the pump and trailer sit on
  • Wherever the excavated dirt and stripped sod get stacked while the base goes in
  • The washout spot at the end of the day

Dry ground takes it, saturated ground does not

The same weather that ruins a finish is the weather that ruins a yard. Rain on green concrete and a freeze on a fresh slab are already reasons we move a date, and a soaked yard is a third one. Wet clay under a loaded truck does not spring back. It ruts deep, and then it holds water in the rut.

There is a slab argument for waiting too. A saturated subgrade will not compact properly, so a wet week is bad news for the base under your concrete as well as for the grass beside it. If you have had three days of rain and the pour is not urgent, waiting is usually the cheaper decision on both counts.

Walk the route with us before anything comes onto the property. If there is a corner of the yard you actually care about, a bed you planted, a spot that stays soft, say it then. Moving a route is free before the day and impossible in the middle of it.

Who puts the yard back

When the forms come out, dirt goes back against the new edges and everything we brought onto the property leaves with us. That is the part that comes with the pour. Anything beyond it, regrading a rutted route, topsoil, seed, is worth asking about at the estimate so it is written on the page like every other item rather than assumed by two people who each think the other one meant it.

One practical note for whoever does end up seeding. If a rut stayed soft and got pressed down, break the compaction up before seed goes down. Grass on top of packed ground comes in thin and the low line shows right through it.

Good questions

Will the truck drive across my lawn?

Only if that is the route we walked with you, and only if the ground will carry it. Sometimes the shortest way to the forms is not the way we take, and that is a decision made before the day rather than by a driver at seven in the morning.

Does the hose kill the grass?

Usually not. Expect a flattened, scuffed line rather than a dead one. Hose full of concrete is heavy and gets walked and dragged to the placing end, so it presses grass down along whatever path it takes.

Can we protect the route with plywood or mats?

Ask when we walk the access. It helps with foot traffic and lighter loads. Nothing you lay down makes soft, wet ground safe for a loaded ready-mix truck, so the honest answer for a saturated yard is a different day.

What about the strip right along the new edge?

That one is unavoidable. The crew has to stand somewhere and the forms need room outside them. When the forms come out we backfill against the edges, and that strip is the part of the yard most likely to want seed.