Can I change the size after the estimate?

The short answer

Yes. Say so before we order concrete and it is simply a new written number, with the square footage, the yardage and the total redone on a fresh page you approve. Once the forms are set and the loads are booked, a change means pulling work apart and reworking the concrete order, so it costs more than the extra footage is worth. After the pour, changing the size means tearing concrete out.

The stakes in the yard are the last cheap look you get

Most size changes come out of the same moment. The outline is staked on the ground, you walk out and look at it, and the patio you had pictured turns out smaller than the furniture you had in mind, or the drive looks tight right where you have to swing a trailer around. That is exactly why the outline gets staked before anything else happens. It is a full size drawing you can stand inside, and it is the cheapest place in the whole job to change your mind.

So go do that walk on purpose. Set a chair where the chair is going to sit. Park the truck where the truck parks and open the doors. Walk the path from the door to the drive the way you actually walk it when it is raining and your hands are full. Two feet on paper is nothing. Two feet under your own feet is a different patio.

If something is wrong, say it that day, before any concrete is ordered.

What actually changes when the size changes

A size change is not a phone call, it is a new estimate. We remeasure, redo the square footage, and hand you another written page to approve before anything gets ordered. Nothing on the job moves until you sign off on the new number, and that is the same rule whether the change makes the slab bigger or smaller.

  • The square footage, which is what the price is built on
  • The volume of concrete, since yardage follows area and thickness together
  • How many ready-mix loads come out, because a job rounds up to the next full load
  • The formwork, if the shape changed and not just the length
  • The grade cut and the stone base, if the new footprint runs onto ground nobody planned to touch

Growing is usually cheap, shrinking usually is not

That last item on the list is the one people do not expect. Pushing a patio out toward a slope, or a drive over toward a soft wet spot, is not only more square feet. It is more dirt moved and more base under it, and compaction on fresh fill is a different job from compaction on ground that has been sitting still for years. The subgrade out there may want treatment the part we already looked at did not need.

Where none of that is in play, adding footage while the crew and the forms are already coming is the least expensive concrete you will ever buy on that property. The trip is already paid for. The equipment is already sitting there. Widening a drive a couple of feet, or running a walk the rest of the way to the door instead of stopping short, costs the added area and not a great deal else.

Shrinking works the other way and saves less than people expect. The crew, the forms, the setup and the delivery run about the same for a slightly smaller slab, so the saving is not proportional to the footage you cut. Concrete also comes in whole loads, which means trimming a job that sits just over a load boundary can save real money while trimming one already comfortably inside a load barely moves the number. There is no charge for pricing it both ways. Call it in, and you can read the two pages side by side before you decide.

Good questions

How late can I change my mind?

The clean line is the concrete order. Before the plant is booked, a change is paperwork and a fresh page. After the forms are set and the loads are scheduled, it means undoing work that is already done and rebooking a delivery, so it stops being free. Once the pour has happened, the only way to change the size is tear out and replace.

Does a bigger slab push my pour date?

Sometimes, and it depends how much bigger. A couple of feet on a drive usually does not. Growing enough to add another load, or enough to need more excavation and more base, can move the date, because the plant and the prep both have to catch up to the new footprint. We will tell you which one you are looking at when you call.

Can I change the finish or the thickness instead?

Yes, and the same rule applies. A different finish, a thicker slab, rebar in place of wire mesh: all of it gets repriced on a new written page and approved before we order concrete. Changing the finish after the fact is not on the table, because the finish goes on the same day the concrete does.

Standing at the stakes having second thoughts?

Call 276-733-3750 before the concrete is ordered. We will remeasure it, put the new size on a fresh written page, and you decide from there.