1. Home
  2. Answers
  3. What Is in a Written Concrete Estimate
Projects and planning

What is in a written concrete estimate?

The short answer

A written concrete estimate names the area in square feet and the slab thickness, the site prep and any tear out, the reinforcement, the mix strength, the finish and the joint plan, how the concrete reaches the forms, and one total with payment terms and the workmanship warranty. A page with all of that on it can be compared to another bid. A one line price cannot.

A price and a scope are two different documents

A number by itself tells you what something costs. It does not tell you what it is. Two crews can put the same figure on the same driveway and be describing two different slabs. One is four inches on packed stone with steel in it. The other is thinner, on less base, with nothing in it at all. You find out which one you bought in the fifth winter, not on the day you signed.

That is the whole reason this gets written down. The page carries your name, your address, and the work spelled out in enough detail that there is no room later for two honest ideas about what was agreed to. It is also the only version of the job that outlives the conversation. What you remember about a phone call and what the crew remembers are rarely the same document, and concrete is not something you redo cheaply when the two do not match.

Going down the page, item by item

Every line on the page is deciding something. Here is what each one settles.

  • Scope and dimensions. How much concrete, written as the square footage we are pouring and how deep it goes. The whole price hangs off this line.
  • Site prep. Everything that happens before concrete, including digging, breaking out and hauling away whatever is there now, cutting grade, and the compacted stone underneath. Most of the labor lives here, and so does most of the difference between two bids.
  • Reinforcement. The steel, meaning whether the job gets mesh or bar, what size, and where it sits, along with any edge that gets thickened to take a heavier load.
  • The mix. The mix, written out by strength for what the slab has to carry. On most work that lands at a 4,000 PSI air entrained design, chosen for the winters up here.
  • Finish and joints. The surface you end up with, whether that is a broom texture, a smooth trowel, exposed aggregate, stamp or color, plus where the joints fall and whether sealer is on the job.
  • Placement. Whether the concrete goes down the chute or has to travel through our trailer line pump to reach a back corner or get through a gate. On our own pours that sits inside the one price instead of appearing later.
  • The number. One total, how payment is handled, and the workmanship warranty, terms confirmed on that same page.

Where two written pages stop agreeing

When two bids come back far apart, the gap is almost never in the concrete itself. It is in the list above. Take an inch out of the thickness, thin the stone base, drop the steel, or leave the old slab for somebody else to deal with, and the bottom line moves a long way while the top line still says driveway.

Some of that gap is readable if you know the going rates. Installed driveways generally run $8 to $12 a square foot and patios and walkways $9 to $14. A rebar or wire mesh grid adds $0.75 to $1.25 a square foot, and tearing out and hauling off old concrete adds $2 to $3. So a page that lands well under another one on the same square footage is usually not a bargain. It is a different job. Why two quotes for the same work come back different is worked all the way through on our cost pages.

Read them side by side and compare like for like. Where one page is silent on the base, the steel or the haul off, ask for it in writing rather than over the phone. A crew that intends to put stone down and wire in the slab has no reason at all not to write it on the page.

The lines that are not dollars

Two parts of the estimate carry no figure and matter as much as the total. Payment terms are written out before you sign, so you are reading them instead of hearing about them afterward. And the workmanship warranty is on there, with the terms confirmed on your written estimate rather than described to you from memory in a driveway.

The other thing a written page does is set a limit on itself. The number moves for two reasons and no others. You change the scope, and you approve the new figure in writing before any concrete is ordered. Or the ground opens up and there is something under it nobody could see from the surface, in which case we stop, show you, and price the fix before going further. The weather, our calendar and a truck running late are ours to solve, not line items that appear on your bill. How that gets handled in practice is spelled out on our free estimates page.

Good questions

How long after somebody measures do I get the written page?

Usually a day or two, sometimes faster. When something out of the ordinary has us waiting on a supplier, you hear about the hold up from us rather than wondering why the phone went quiet.

What should I do with a bid that is only one line long?

Ask for the scope in writing before you compare it to anything else. Thickness, base, reinforcement and whether haul off is included are the four items that decide what you are actually buying, and any crew that plans to do them will put them on paper.

Should the estimate say what strength the concrete is?

It should. Ours names the mix, which at this elevation is usually a 4,000 PSI air entrained design picked for the freeze and thaw. Strength is specified to the load, so a shop floor and a garden walk are not the same order.

Want a page you can lay next to another bid?

Call 276-733-3750 and we will measure the job and put the scope, the base, the steel, the mix and one total on a page you can compare against anybody else's.

Call Free Quote