1. Home
  2. Glossary
  3. Silt fence
Glossary: Ground and base

Silt fence

Definition

A silt fence is a temporary barrier of woven fabric staked along the low side of a construction site to catch soil in runoff before it leaves the property, keeps sediment out of ditches and storm drains, and stays up until the ground around a new slab is stable.

A sediment filter, not a safety fence

People often lump silt fence in with the orange plastic fencing that shows up around a job site, since both arrive on stakes before anything else happens. They do different jobs. Orange construction fencing marks a boundary and keeps people and vehicles out of a work area. Silt fence is a filter: the woven fabric lets water pass through slowly while it holds back the dirt the water was carrying. One is about site safety and access. The other is about keeping mud out of the ditch, the neighbor's yard, and the storm drain down the hill.

Where it goes and how long it stays up

On a site with any real grading or excavation, silt fence runs along the low side of the disturbed ground, staked into the soil with the bottom edge of the fabric trenched in so water cannot just slide underneath it. It stays up through excavation, base work and the pour itself, because that is when bare dirt is most exposed and most likely to wash. Once grass or gravel is established and the ground around the new slab has settled, it comes down. A small driveway or patio job might need a short run of fence at one low corner. A larger site with more grading can need it wrapped around most of the low side of the lot.

Whether your job needs one

Not every pour disturbs enough ground to need it. A small patio replacing an existing slab in the same footprint is a different situation from a new driveway cut into a slope, where a good amount of dirt gets moved and graded before any stone or concrete goes down. Whether your site calls for silt fence comes down to how much ground gets disturbed and what your county wants for that scope of work. That is worth asking about at the estimate, along with everything else site prep involves.

Good questions

Do you install the silt fence yourselves?

It depends on the job. On sites where grading disturbs enough ground to call for it, silt fence is part of what gets planned for during site prep. Ask when you call and we will tell you what your specific site needs and who is putting it up.

Does silt fence replace grading that sheds water away from the house?

No. Grading and the slope of the finished pad are what actually move water away from a building once the job is done. Silt fence only manages the sediment in water that is running off a disturbed site while the work is in progress. Once the site is stable and the fence comes down, the grading is what is left doing the work.

Wondering if your site needs one?

We look at how much ground your job will disturb before we ever pour. Call 276-733-3750 and ask.

Call Free Quote